CHAPTER Ii, SECTION 5S

Figure 2-165.

Station 2310 - 88% Completed
we
oT
‘

*
*
~

ENGINEERING. Design criteria were received
on 4 June. On 2 December, the User requested
that part of the walls be removable. Figure 2-165
shows the Station with the portable walls removed. The construction progress as shown,
was estimated at 88% completed. Design work
began on 22 June. Six drawings were prepared
and submitted from 17 July thru 6 August.
These drawings were approved from 31 July
thru 27 August.
CONSTRUCTION. Construction was scheduled
to commence on i November and to be com-

pot

~-

pleted on 15 January. Actual work started on

8 September and was completed on 16 January

1954.

STATION 2311 - MIRROR SHED
SITE RUBY - USER: UCRL
GENERAL. This Station was similar to Station 2310. 12’- 0” x 53’°-0” x 18-0” high, and
only one end wall was removable.
ENGINEERING. Reported under Station 2310.

CONSTRUCTION. Work was scheduled to
commence on 1 November and to be completed

“+ BERL TRAILERS /
Figure 2-166.

Station 2400.01 - 98% Completed
Pege 2-147

ee en raneene me

eee”

A nee e +e pate

met ee ee

fe ee

a ee

eo tewawan eB Siena HE te elalanlnlean Hanafe Be «
ee”

+ anema

A EF PAOALtS OTR A8

“FTE S$27

ener ES

eee 0 akce eeteeeLc

Select target paragraph3