CHAPTER Ii, SECTION 5S
Figure 2-165.
Station 2310 - 88% Completed
we
oT
‘
*
*
~
ENGINEERING. Design criteria were received
on 4 June. On 2 December, the User requested
that part of the walls be removable. Figure 2-165
shows the Station with the portable walls removed. The construction progress as shown,
was estimated at 88% completed. Design work
began on 22 June. Six drawings were prepared
and submitted from 17 July thru 6 August.
These drawings were approved from 31 July
thru 27 August.
CONSTRUCTION. Construction was scheduled
to commence on i November and to be com-
pot
~-
pleted on 15 January. Actual work started on
8 September and was completed on 16 January
1954.
STATION 2311 - MIRROR SHED
SITE RUBY - USER: UCRL
GENERAL. This Station was similar to Station 2310. 12’- 0” x 53’°-0” x 18-0” high, and
only one end wall was removable.
ENGINEERING. Reported under Station 2310.
CONSTRUCTION. Work was scheduled to
commence on 1 November and to be completed
“+ BERL TRAILERS /
Figure 2-166.
Station 2400.01 - 98% Completed
Pege 2-147
ee en raneene me
eee”
A nee e +e pate
met ee ee
fe ee
a ee
eo tewawan eB Siena HE te elalanlnlean Hanafe Be «
ee”
+ anema
A EF PAOALtS OTR A8
“FTE S$27
ener ES
eee 0 akce eeteeeLc