CHAPTER Il, SECTION 5
STATION 1353 - OPTICAL BAFFLE
SITE ABLE - USER: LASL
GENERAL. This Station was used for the same
purpose and was similar to Station 1352. It measured

15°- 0" x

120°-0” and was mounted 35

STATIONS 1354, 1355, 1356, AND 1357
OPTICAL BAFFLES
SITES DELTA AND ABLE - USER: LASL
GENERAL. These four plywood baffles were
12'- 0" x 20°- 0" with two round openings as
shown in Figure 2-135.
ENGINEERING. The original design criteria
were received on 13 October, One drawing was
required which was started on 14 October, submitted on 22 October, and approved on 6 November.
:

ete

Figure 2-133.

a5

Stations 18
Aerial View

«ad 1353

feet above the ground. Figure 2-133 shows the
structure 61% completed on & January. Anchors
at the water's edge for securing the guy wires
will be noted.
ENGINEERING. The criteria were received on
5 August. One drawing was required, which
was started on 7 August, submitted on 13
August, and approved on 1 October. ‘vo revisions were required.
CONSTRUCTION. Work was planned to commence on 10 October and to ke completed by
15 January 1954. Actual construction started
on 15 December and all work was completed on

Figure 2-135. Station 1354 - Typical
Optical Baffle
-

=~<

oe,

iei”

CONSTRUCTION. Work was planned to commence on 10 October and to be completed by
15 Januaiy 1954. Actual construction on Stations 1354, 1355, and 1356 started on 15 December and was completed by 6 February 1954.
Station 1357 was started on 31 Wecember and
was comu.cted on 25 January 1954.

STATION 1401 - INSERT ON STATION 1341
SITE DELTA - USER: LASL
GENERAL. T..is Station was located in the
middle of the front face of the lower exterior
wall of Station 1341. The work involved con-

sisted of mounting User Neutron Detector
equipment using holcs cast vertically in the exterior wall.

ENGINEERING.Design criteria were received

=. a

Figure 2-134.

-

Station 1353 - Completed

20 January 1954. Figure 2-134 shows the Station completed as of 5 February. The face openings and their relations to Station 20 may be

noted. Station 20 is at rear over the right-hand

corner of the baffle.

on 14 May and on 5 August 1953. On 30 September additional criteria were received, changing the position of the Station. On 21 October,
additional items were added. The design work is
included with Station 1341.
CONSTRUCTION.
Work was scheduled to
c .nmence on 1 November and to be completed
on 15 February 1954. Actual work started on 17
July and was completed on 25 January 1954.