CHAPTER If, SECTION 5

Figure 2-132.

Station 1351 - Completed

cantilevered out over Station 1202, as shown tn
Figure 2-132. This figure shows subject Station
completed as of 3 February.
ENGIUNEERING. The criteria were received on
22 May. Plan data are included with Station 20.
CONSTRUCTION.
Work was scheduled to
start on | November and to be completed by 3"
December.
Actual construction started on
September and was completed on 25 January.

STATION 1352 - OPTICAL BAFFLE
SITE DELTA - USER: LASL
GENERAL.This Station was a plywood baffle,
Page 2-128

3° - 6" x 10’ - 6" and mounted 25 feet ahove the
ground with face openings and braced with guy
wires, It was used for Project 13.5 (high speed
photography ).
ENGINEERING. The criteria were received on
5 August. One drawing was required, which was
started on 7 August, submitted on 13 Aucust,
and approved on 1 October. Two revisions were
required.
CONSTRUCTION. The construction schedule
was planned for work to commence on 10
October and to be completed by 15 January
1954. Actual construction started on 15 December and was completed on 3 February 1954.

Select target paragraph3