CHAPTER If, SECTION 5 Figure 2-132. Station 1351 - Completed cantilevered out over Station 1202, as shown tn Figure 2-132. This figure shows subject Station completed as of 3 February. ENGIUNEERING. The criteria were received on 22 May. Plan data are included with Station 20. CONSTRUCTION. Work was scheduled to start on | November and to be completed by 3" December. Actual construction started on September and was completed on 25 January. STATION 1352 - OPTICAL BAFFLE SITE DELTA - USER: LASL GENERAL.This Station was a plywood baffle, Page 2-128 3° - 6" x 10’ - 6" and mounted 25 feet ahove the ground with face openings and braced with guy wires, It was used for Project 13.5 (high speed photography ). ENGINEERING. The criteria were received on 5 August. One drawing was required, which was started on 7 August, submitted on 13 Aucust, and approved on 1 October. Two revisions were required. CONSTRUCTION. The construction schedule was planned for work to commence on 10 October and to be completed by 15 January 1954. Actual construction started on 15 December and was completed on 3 February 1954.