CHAPTER II, SECTION 5 STATION 1402 - NEUTRON DETECTORS SITE DELTA - USER: LASL GENERAL. This Statien was identical with the 1403 scries reported below, ENGINEERING. The design criteria, design work and drawings are also the same as reporsted in the 1403 series. CONSTRUCTION. Work was scheduled to commence on | November and to he completed on 15 February 1954. Actual construction work atarted on 15 December and was completed on 25 January 1954. Figure 2-136. STATION 1403.01 - 1403.16 NEUTRON DETECTORS- SITES VARIOUS USER: LASL ENGINEERING. The design criteria were received on 14 Mav 1953 for Stations 1403.01 GENERAL. These Stations were located on islands and reefs from site Able to Easy, and at site Gene. Each Station consisted of < reinforced concrete slab, 5’°- 4" x 77-0" % 2-6” with a raised triangular cross section embedded thru 1403.16. Design work started on 24 July, and one drawing and one sketch were submitted on 29 July. approved and issued on 7 August. On 13 July, Station 1403.17 was added. On 23 October, Stations 1405.15, 1403.16 and 1403.17 were deleted. With the re-scheduling of tests and Stations after shot Bravo, Stations 1403.15 and 1403.16 were added at Gene. on one face with eight owvo-inch diameter bolts. Figure 2-136 shows Station 1403.08, which 1s typical for the series and 90 completed as of 4 December. Two holes were located between the holts: one of 12-inch diameter and sixinvhes deep, the other of nine-:nch diameter and four and one-half inches deep. Figure 2-137. Page 2-130 CONSTRUCTION. Work was scheduled to commence on 1 October and to be completed on 13 January 1954. Actual construction starting Statisn 1550 - Construction of Wall Forms oo ~ ° TleATSI TORTSE — - eweee = Station 1403.03 - Typical * a