CHAPTER If, SECTION 5

Figure 2-103.

Station 1201 - 42% Completed
en

by 31 Decernber. Actual construction started
on 3 September and was completed on 29
December.

STATION 1203 - PIPELINE
SITE CHARLIE - USER: UCRL

Figure 2-104.

Station 1201 - Entrance to

Figure 2-105.

GENERAL.
This Station, used tor reaction
history, consisted of a group of 12 pipes, or a
pipe array, 7437’- 6” long supported by wood
frames spaced approximately 20 feet apart.
Pipes were fabricated of 12-gage steel, spiral
wound, shaped and welded to form an 8 5 8”
Q. D. pipe. Individual pipes were fabricated in
40-foot lengths and were billet welded together
at site to form bents approximately 240 feet
long. In each bent a rubber pipe secticn 24
inches long was inserted to serve as an expansion
joint and, a light probe opening was provided

Staton 1201 - Completed

Page 2-111

Select target paragraph3