CHAPTER Il, SECTION 5 Figure 2-102. Stations 1200, 1201 and 1204.03 Completed Station 1201 poured as of 5 November. Figure 2-104 notes the entrance to the Station. In the rear is the 12 pipe array. The Station. as shown on 4 December, was 79% completed. Figure 2-105 shows the Station completed as of 3 February with Station 1200 (at right) earth covered. Other views of Station 1201 completed are shown under Station 1200. Figures 2-1G0 and 2-102. STATION 1202 SHIELD WITH CONVERTERS SITE BAKER-CHARLIE REEF USER: UCCRL GENERAL. This Station. used for reaction history, consisted of an earth-filled 12°-0" x 44°-0"% x 22’-0" high reinforced concrete structure sup- ported on H-bearing piles. A concrete chute extended into Station 20. Equipment was supportedoon tall concrete piers. There was no roof over the burlding. ENGINEERING. The original design criteria were received on 19° Mav. New criteria were received on 23 June, 12 August and 18 September. Design work was started on 23 June. Four drawings were prepared and sumitted from 17 Juiv to 14 September. Approvals were dated from 3b July to 19 Noventber. Figure 2-106 shows the Station as 9°. ' campleted as of 4 December. The figure shows the south and cast walls of Station 1202. Pos CONSTRUCTION. Work was scheduled to vommence on 1 October and to be completed 1 ' i Page 2-110