CHAPTER !I, SECTION 5
ELECTRICAL.

This Station was supplied

power originally from an engine generator unit,
but on 14 April 1954, it was tied into the island
power distribution system,
ENGINEERING. Two plans were submitted
on 20 October 1953 and were approved on 24
November.
CONSTRUCTION. Work was started on 3
November 1953 and was completed on 16 January 1954.
STATION 710 TRAILER - SITE NAN
UsER: AFOAT-1
GENERAL. The work involved consisted of
installing a trailer and type A tent with eleetrical connections as desired by the User for
Project 7.1, electromagnetic radiation.
CONSTRUCTION. Work started on 245 Januarv 1954 and was completed on 4 Februarv.
STATION 71l - TRAILER AND TENT
SITE ELMER - USER: AFOAT-1

Page 2-106

GENERAL. This Station was reactivated from
IVY Station 605 in March 1954 due to the

rescheduling of the Test Program. The work
involved canststed of installing cables to Station
72.93, installing power units and air conditioninz unit and replacing earth fill for Project 7.1.
Figure 2-97 shows the south and east walls
with power connections.
ENGINEERING. Field Engineering prepared
tield sketches 4s required.
CONSTRUCTION,
Work commenced on 30
March 1954 and was completea on 13 April
1954.

“TATION 1110 - J114
CFE IN CYLINDERS - SITES VARIOUS
USER: LASL
GENERAL. Station L116 was jucated inside of
Station 20 and the other stations were located

GENERAL. Same as Station 710 wath the
exception that support work only was required.

Figure 2-97.

STATION 712.- TRAILER AND STATION
SITE YVONNE - USER: AFOAT-1!

on each of the four barges. The work involved
consisted of onstalling bolted steel frames to
-upport eviinders. Each evlinder was held down

Station 712 - Interior