CHAPTER !1, SECTION 5
GENERAL, This Station was an carthfilled,
reinforced concrete box 6’- 0% x 12-0" x 9’- 0”
high with no openings except a removable 2’- 0”
x 30” steel panel. The floor of this Station was
below grade, located so that only the upper six
feet of vhe structure was exposed. This structure
housed
pressure
gages
which
were
connected
with conduits to a junction box equipped with
a cover plate, and accessable from outside the
ENGINEERING. Original design criteria were
for Station 315.01 and were received on 3
August. On 23 October this Station was deleted.
On 27 October this Station was reinstated and
Station 315.02 was added. The drawing required was included with the drawing for the
Station 120 series.
CONSTRUCTION.
Construction work was
<cheduled to commence on 15 November and
to he completed by 15 February. Actual con<truction started on 19 December and was com-
structure.
pleted on 9 January 1954.
ENGINEERING.
The original criteria were
received on 30 April and design work of three
plans and one sketch started on 1 June. On
7 July, this Station was cancelled and then
re-established on 21 October. Plans were completed on 28 October and approved on {7
November.
STATION 322
RAYDIST EQUIPMENT SHED
SEITE NAN - USER: SRI
CONSTRUCTION.
Constructian work was
scheduled to commence on 1 January and to
be completed hy 28 February. Actual construction started on 1} December and was completed
on 13 February.
STATIONS 311.01
AND 3211 09
10 FOOT HIGH GAGE TOWERS
SEITE UNCLE - USER: SRI
GENERAL. Each Station consisted of a 2’ - 6”
cube concrete footing. A 3” 1. D. s.eel pipe was
embedded into this footing and projected out
of the side by bends and extended ten feet
above the grade. This pipe was guyed in three
directions and at two levels. These towers were
used for Project 3.1.
GENERAL. This Station was a 9*-0" x 13’-0”
wood-frame structure with plywood sides and
aluminum roof. The Station was mounted on
six-inch by six inch wood skids and was used
in connection with Project 3.2.
ENGINEERING. One field sketch was prepared by Field Engineering.
CONSTRUCTION. Work started on 1 Februarv
1954 and was completed on 6 February.
CT APR TSUN
TR Sh ALD
EN
Vt Tt
PAA A
Uae
RAYDIST EQUIPMENT
SITES VARIOUS - USER: WADC
GENERAL. These Stations, located at sites
Fred. Glenn, LeRoy and Elmer were added
in March 1954 due to the rescheduling of the
Test Program. The work involved consisted
of installing Ravdist equipment, motor generator sets and providing fuel tanks for Project
6.2.
ENGINEERING. The original design criteria
were received on 30 April. On 7 July. these
Stations were relocated. On 5 August, Station
311.02 was deleted and on 23 October, Station
WLAL was likewise deleted, Qn 27 October,
both Stations were reinstated but at a new
location. One drawing was started on 26 May,
submitted on 29 Mayard approved on 19 June.
ENGINEERING. Ficld Engineering prepared
drawings and field sketches as required.
CONSTRUCTION.
Construction work was
scheduled to commence on 10 November and
to be completed by 28 February. Actual construction started on 24 December. The User
requested occupancy by 15 February. All work
GENERAL. This Station was added in March
1954 duc to the rescheduling of the Test Program. The work involved consisted of furnishing a barge with fittings and mooring in location
selected for Project 6.5.
STATIONS 315.01 AND 315.02
PITOT TUBE MOUNTS
SITE UNCLE - USER: SRI
ENGINEERING. Field Engineering prepared
field sketches as required.
CONSTRUCTION.
Work commenced on 5
April 1954 and was completed on 21 April.
was completed by 6 February.
GENERAL. The structure consisted of a cube
block of reinforced concrete, 5’- 0% x 5*- 0" x 35’- 0"
An 8” 1.D. round steel pipe projected 3’-0"
above the top center with a three-inch conduit
out to the side of the Station. Used for Project
3.1.
CONSTRUCTION.
Work was started on 12
April 1954 and completion dates varied from
13 April to 15 April.
STATION 6450 - MOOR BARGE 125
SITE ENIWETOK LAGOON - USER: CRL
STATION 661 - ANTENNA POLE
SITE ELMER - USER: ESL
GENERAL. This Station consisted of a wood
pole set securely in the ground with a braced
cross-arm 50 feet above the ground for ionosphere study, Project 6.€.
Page 2-105
ee mT
Peres Ae ee
STATION 310 - TARGET
SITE UNCLE - USER: SRI