CHAPTER If, SECTION 5
CONSTRUCTION.
Work was scheduled to
start on 15 September and to be completed on
31 December. Actual construction started on 10
December and was completed on 2 January
1954.

STATIONS 145.01 - 145.07
INSTRUMENT CANS
SITE ENIWETOK LAGOON
USERS: ONR and NOL
GENERAL.EachStation consisted of a five-ton

instrument can placed in the Eniwetok Lagoon

as designated vy the User.
ENGIMEERING.
The
spotted the locations,

Survey

Department

CONSTRUCTION. The Marine Department
placed the moorings furnished by the User and
assisted the User in securing the cans to the
moorings. Work was started on 7 April 1954
and was completed on 14 April.

STATION 145.27 - 145.29
INSTRUMENT CANS
SITE BIKINI LAGOON
JSERS: ONR and NOL
GENERAL. These Stations were located off
site George in the Bikini Lapaon and were
similar to the 145 series. These Stations were
autheized on 6 June 1954 and were used in
connection with the Station 30 detonation.
STATIONS 162.01 AND 162.02
SHORE RECORDER
SITES NAN ind TARE - USER: ONR
GENERAL. The Stations consisted of recorder
units furnished by the User.
ENGINEERING. One drawing was submitted
on 18 August and was approved 3 November.
CONSTRUCTION. The work involved consisted of furnishing wiring and assistance in the intallation. Work was undertaken in December

STATIONS 170.01 - 170.05
ACCELEROMETER STATIONS
SITES - VARIOUS - USER: SANDIA
GENERAL. These five Stations were located
as follows: 170.01 on site Tare, 170.02 and .03
on site Sugar and 170.04 and .05 on site Pearl.
The work involved ccnsisted of placing User
equipment from 15 to 30 feet m the ground
and encasing this equipment in concrete. This
equipment measured ground accelerations.

Completion dates varied from 10 December to
10 April.

STATIONS 210.01 - 210.61
FILM BADGE STATIONS (ON STAKES)
SITES VARIOUS - USER: ESL
GENERAL. Stations 210.01 thru 210.41 and
210.53 thru 210.56 were located on the various
islands and reefs of the Bikini Atoll. Stations
210.42 thru 210.52 and 210.57 thru 210.61 were
located on the various islands and reefs of the
Eniwetok Atoll.
These Stations were Film
Badge Stations to measure the gamma total
dose, and each Station consisted of a two-inch
aluminum rod embedded four feet into the land
or reef. The land Stations projected two feet
above grade: the reef Stations projected four
feet above the high water line.
ENGINEERING. Criteria were received on 12
May 1953, drawings were started on 7 July
and submitted for approval on 9 July. AEC
approved same on 25 July and prints were
issued on 31 July.
Originally only Stations
219.01 thru 210.52 were authorized. On 28
October, Stations 210.53 thru 210.59 were added
and on t March 1954, Stations 210.60 and
210.61

were

likewise added.

Figure 2-95 is

tynical for the series and shows Station 210.23
on Oboe as completed on 5 January 1954.

CONSTRUCTION.
Work was scheduled to
commence on 1 November and to be completed
on 31 January 1954. The starting dates of the
individual Stations on Bikini varied from 11

November to 31 December.

The completion

dates varied from 5 January to 29 January.
On Eniwetok. the starting dates varied from
31 December to 19 January 1954 and Stations
were completed on 25 January with the exception of Stations 210.60 and 210.61. These two
latter Stations were started on 1 March 1954
and were completed on 6 March.

STATIONS 22001. 9°0 08 - 990.14
DOUBLE DETECTOR STATIONS
SITES VARIOUS - USER: ESL
GENERAL. These Stations were located on
various islands in the Bikini Atoll. The work
involved consisted of embedding User’s equipment in approximately three cubic yards of
reinforced concrete. The cquipment measured
gamma dose versus time.
ENGINEERING. The original design criteria
were received on 29 May and a revised list of
Station numbers and locations was received on
2 July. One drawing was started on 7 July,

ENGINEERING. Theoriginal design critera
were received on 11 May 1953. Drawings 1»
quired were included with Station 220 series.

submitted on 9 July and approved on 28 July.
Ore detail drawing was submitted on 29 November and approved on 22 December.

CONSTRUCTION.
Work was scheduled to
commence on 1 October and to be completed on
15 January 1954. Actual construction starting
dates varied from 7 September to 2 Decemb: r.

commence on 1 November and to be completed
by 15 January. Actual starting dates varied
from 9 November to. 18 January; completion

Page 2-102

CONSTRUCTION.

Work was scheduled to

Select target paragraph3