CHAPTER II, SECTION 5

123.06 and 123.07 were deleted. On 9 Septeriber

Station 12°..01 was relocated and Stations
123.04 and 123.05 were deleted. Drawings were
started 16 June and were included with the
Station 122 series.
CONSTRUCTION.
Work was scheduled to
commence on 1 November and to be completed
by 10 February 1954. Actual construction started 11 November and was completed on 26
December.

STATIONS 130.01 - 130.07 - PITOT GAGES
SITES VARIOUS - USER: SANDIA
GENERAL. These Pitot Tube Gage Mount
Stations were identical to the Station 315 series;
description is reported under the 315. series.
These gages were to be used to record shock
winds and after winds.
ENGINEERING. Criteria for Stations 130.01
thru 130.05 were received on 11 May. Or 9 July,
Station 130.06 was added and on 9 September

pm hos

footing to which were attached gages for cahbrating lorce, drag, temperature and density.
Figure 2-94 shows this Station as 90S completed on 5 December. The Station vas located
on the shore line and required protection from
possible tidal and wave damage. Extra concrete
was poured in front of the Station as noted in
the photograph.
ENGINEERING. The original design critema
were received on 9 September. One drawing “is

required which was started on 10 September,
and included with the Station 130 series.

CONSTRUCTION.
Work was scheduled to
commence on 15 September and to be completed
on 30 January 1954. Actual construction started
on 19 November and was completed on 23 January 1954.

STATION 142.02 - TEST HOLE PIT
SITE FOX - USER: ONR
GENERAL.This Station was a test hole, or pit,

and ‘vas used for determining underwater pressure versus time.

ENGINEERING. This Station was relucated
from George to Fox, as an clevation of pius ten
feet was required. Test hole No. & was available
and used.
CONSTRUCTION. Work was started on 20
December 1953 and was completed 23 January
1954.

STATIONS 143.01 - 143.44
BUOY WITH ANCHOR
SITE BIKINI LAGOON - USER: ONR

Figure 2-94. Stations 130.07 and 131
90% Completed
Station 130.07 was Likewise added. Figure 2-94
includes Station 130.07 on site George and it is
shown 90°% completed on 5 December. Design
data is reported under the 315 series.

CONSTRUCTION. Work was scheduled to com-

mence on 1 October and to be completed on 10
January 1954. Actual construction starting time
varied from 7 September to 15 December. Completion dates vaned from 9 January to 25 January 1954.

STATION 131
MULTIPLE PITOT TUBE MOUNT
SITE GEORGE - USER: SANDIA

GLNERAL.
conerete buoy
jecting above
were attached
water pressure

These Stations were reinforced
anchors with a hooped har proand below the anchor to which
instruments for measunng underversus time.

ENGINEERING. The original design criteria
were received on 29 June 1953. One drawing
Was required which was started on 24 July,

submitted on 5 August and approved and released on 2 Septembez.

CONSTRUCTION.

Work was scheduled to

commence on 15 September with completion on
31 December. Actual construction started 10
December and all Stations were complevwd and
placed by 2 January 1954.

STATION 144.01 - 144.16
BUOY ANCHORS
SITE BIKINI LAGOON - USER: GNR

GENERAL. This Station consisted of a con-

GENERAL.
These Station. were reinforced
concrete buoy anchors and were used to record
underwater pressure versus timo,

pipe had a three-inch round conduit embedded

ENGINEERING. The criteria were received on
23 July. Drawings required were ‘ncluded with
the Station 143 series.

crete footing 5° x 20’ x 5’ deep with four 8” I. D.
pipes embedded in the footing and projecting
three feet above the top of the footing. Each
in the concrete and extending to the side of the

Page 2-101