CHAPTER !I, SECTION 4

ee

a

he

f

7

i
r

Figure 2-63.

Figure 2-65. Parachute Tower - Site Fred

Airstrip - Site Janet

CONTRACT ITEM NUMBER 4-67-C
MISCELLANEOUS CONSTRUCTION
BOTH ATOLLS

copter mat and clearing on site How, concrete
deadmen, additional electrical wiring of various

GUNERAL. This Contract Item consisted of
some 42 miscellaneous jobs. Some of the larger

ENGINEERING. All drawings and field
sketches were prepared by Field Engineering.

these

jobs

Culisisted

of

iaVigalional

lage

lights, alterations to radiac building, decontami-

nation barge, rehabilitation of airstrip on site
Janet, storm damage repairs on Eniwetok and
Bikini Atolls, cargo pier damage repairs, heli-

Figure 2-64.

Page 2-82

A eeeT

Pe er Oe

CONSTRUCTION.

Work started on 1 July

1953 and ail items were completed by March

1954. Figure 2-63 shows the airstrip at site
Janet after rehabilitation. Figure 2-64 notes the

Helicopter Mat - Site How

ane we ee

of

facilities, and recreational facilities on site How.

Select target paragraph3