Air Force Warehouse - Site Fred

clearing completed and helio mat installed on
site How.

CONTRACT ITEM NUMBERS A-68-C
THRU 4-68.35 - J.T. F. CONSTRUCTION
SITE FRED
GENERAL. Work under this Contract Item
consisted of construction required at site Fred,
principaliy by Task Groups 7.2 and 7.4, in
support of the Operation and embraced some
31 separate items, the larger of which consisted
of Suppiy Warehouse, eight wood prefab buildings, eight steel prefab buildings, Airfield Improvements, Parachute Drying Tower and RePack Building, floor slab for Hangar Building,
modification of Building 15 Cryptovault, Instrumentation Building, Photo Lab, Depot Supply
Building, extend Air Operations Building, and

miscellaneous construction. This construction,
in conjunction with Contract Item A-40, enabled the Army and Air Force to maintain
their headquarters at Fred in support of the
Operation instead of basing part at Kwajalein
and part at Fred as was donein past Operations.
These facilities are shown in Figure 1-3.
ENGINEERING. Field Engineering made the
investigations, reports and surveys of the various
existing facilities to be rehabilitated. All necessary drawings were prepared at Jobsite.
CONSTRUCTION This construction was continuous as required from 1 June 1953 to 30
April 1954. Figure 2-66 shows Building 638,
Air Force Warehouse on Fred (Item A-68.1)
as completed on 10 February 1954. Figure 2-67
is a similar illustration. Figure 2-68 notes the

Fao