CHAPTER Ii, SECTION 4

Figure 2-61.

Progress Photograph, 14 September - Fox Camp

fuel lines with mooring buovs, all complete with
valves, pipe and fittings, and power service from
portable electric generator unit. This facility
was established on a minimum basis at site

Sugar as a central distribution point to supply

CONSTRUCTION. Work was started on 27
June and was completed on 31 December 1953.
Additional minor work was authorized on 4 January 1954 and 9 February. All work was completed by 20 February 1904.

me ee

fuel for motor vehicles. gas-driven generator
units, helicopters and planes opcrating in the
vicinity of the atoll, marine craft and construction equipment.

ENGINEERING.
All drawings and field
sketches were prepared by Field Engineering.

Figure 2-62.

Aerial - Fox Camp Completed
Page 2-61