(2)
ec.
Continve routine duties,
OnConditionIi:
(1)
Squedron Commanders vill suspend a11 routine activity
(2)
Men command posts end establish messenter service to
and direct maximum efforts tovard storm preparations,
Building 135 or 41 (refer to peragranh 5, Basic Flan)
in event of pover and telephone failure,
a.
(3)
Commander, Test Support Unit, establish uessenger service
(4)
Secure buildings and tents for typhoon vrotection to
to Building 90,
the extent of capabilities on hend,
On Condition I:
(1)
Squadron Commanders ond Unit Chicfs will:
Turn off electrical pover to all builcinzs except those
requiring lighting during the emergency,
(2)
Station damage control, rescue, and first aid parties,
(3)
Move all personnel inside typhoon shelters excant those
on authorized duties, .(See Appendix 3).
.
e.
(Sco Appendix 3).
Damage control parties may be able to reuedy ninor
demage as the storm progresses and before it develops
into major damage.
Post Storm Actions:
Squadron Commanders end Unit Chiefs will:
(1)
Maintain emergency commmications until normel chennels
(2)
Provide for first aid and movanent of injured persomel
(3)
Muster personnel and ‘report all casualties anc nissing
(4)
Institute domare survey an@ report extent of damage to
Camanior, Test Support Unit.
(5)
Begin rehabilitation vork to resume normal conZitions 2s
are restored,
to the hospital or other designated place in the event
hospital building is inoverable,
persomiel'to Personnel Officer, Test Supzport Unit.
TASK GROUP 7,4. ~
OPRS PLAHO, 2-54,
ANNEX C, APNDZ 1
soon 2s possible,
c1-2