JOHNSTON ATOLL
F &S NO.

01084
USER

TC/LRL

FUNDING
AGENCY

SCIENTIFIC

TITLE

SOSR Rocket Assembly and Checkout Bui.dings - Subtask A941
STRUCTURE /FACILITY NO.

SCIENTIFIC STATION NO.

888

($000)

ENGR

JTF-8
MILCON
CRO7-64|
CRO7-65

PRE-GO
Prior Cost
POST-GO
Est. 3/65
SUBTOTAL

AEC

PRE-GO
FY 69
FY 70
SUBTOTAL
TOTAL

None

PROC

CONST

Bo

FOD GO+150
TOTAL

FURN

25.9

45.0

244.5

315.4

25.9

45.0

244.5

315.4

* 70.0
105.0

95.0
105.0
:

25.0
25.0
50.9

45.0

3.0
3.0

3.0

PRIOR YEARS
ENGINEERING

Completed.

Drawings:

91-884-Cl1
91-888-Al thru A5
91-888-S1 thru S5
91-888-M1 thru M6

PROCUREMENT

91-888-E1 thru E3
91-888-W1 thru W3
91-030-W22

Completed.

CONSTRUCTION This facility is a 60 x 100-ft. structural steel building with
corrugated asbestos cement siding, a built-up roof and a reinforced concrete

floor designed to support 100 psi. The interior walls of the building are insulated and covered with gypsum board. The main portion of the building is
the assembly and checkout area which consists of an adjoining high bay area

and a low bay area.

(Completed in 1967.)

The high bay area is 40 x 40 x 45-ft. high.

A caged ladder extending from

ground level to the roof on the exterior of the building and a catwalk on the
roof provide access to 5-ton capacity moment of inertia suspension points.
A monorail installed the full width of the high bay area is equipped with a 5-

ton hoist having a 40-ft. maximum hook height.

A 16-ft. wide x 12-ft. high

biparting sliding door provides access to the high bay area from the outside.
An 18 x 18-ft. concrete ramp is provided on the exterior side of this door.
*Procurement and Construction Funds

1-73

; SSSR

VOL I

April 1969