JOHNSTON ATOLL
F &S NO.
01084
USER
TC/LRL
FUNDING
AGENCY
SCIENTIFIC
TITLE
SOSR Rocket Assembly and Checkout Bui.dings - Subtask A941
STRUCTURE /FACILITY NO.
SCIENTIFIC STATION NO.
888
($000)
ENGR
JTF-8
MILCON
CRO7-64|
CRO7-65
PRE-GO
Prior Cost
POST-GO
Est. 3/65
SUBTOTAL
AEC
PRE-GO
FY 69
FY 70
SUBTOTAL
TOTAL
None
PROC
CONST
Bo
FOD GO+150
TOTAL
FURN
25.9
45.0
244.5
315.4
25.9
45.0
244.5
315.4
* 70.0
105.0
95.0
105.0
:
25.0
25.0
50.9
45.0
3.0
3.0
3.0
PRIOR YEARS
ENGINEERING
Completed.
Drawings:
91-884-Cl1
91-888-Al thru A5
91-888-S1 thru S5
91-888-M1 thru M6
PROCUREMENT
91-888-E1 thru E3
91-888-W1 thru W3
91-030-W22
Completed.
CONSTRUCTION This facility is a 60 x 100-ft. structural steel building with
corrugated asbestos cement siding, a built-up roof and a reinforced concrete
floor designed to support 100 psi. The interior walls of the building are insulated and covered with gypsum board. The main portion of the building is
the assembly and checkout area which consists of an adjoining high bay area
and a low bay area.
(Completed in 1967.)
The high bay area is 40 x 40 x 45-ft. high.
A caged ladder extending from
ground level to the roof on the exterior of the building and a catwalk on the
roof provide access to 5-ton capacity moment of inertia suspension points.
A monorail installed the full width of the high bay area is equipped with a 5-
ton hoist having a 40-ft. maximum hook height.
A 16-ft. wide x 12-ft. high
biparting sliding door provides access to the high bay area from the outside.
An 18 x 18-ft. concrete ramp is provided on the exterior side of this door.
*Procurement and Construction Funds
1-73
; SSSR
VOL I
April 1969