JOB 5 WORK ORDERS (Continued)
AEC
W,0,No.

Description

Date
Issued

1037

Furnish pump man; erect 2 tents w/frames. 5/5/51

1038

Repair Remington Typewriter.

Site

OD

5/7/5.

User
TU 3.1.5
SBN 2,0

1039 * Dismantle & move photo tower from M to B. 5/7/51

M

EG&G

1040

Move two thermal stations & Onan generate, 5/8/51

L

SEN 2,0

1041

Provide cat & trailer for clean-up opera- 5/10/51 B,N
tions,

EG&G

1042

Furnish crane & operator for recovery

5/10/51

&

Prog. 1.7

1043

Furnish labor to assist in recovering
material,

5/10/51

V

NRLK

1044.

Furnish bulldozer and operator.

5/10/51

D

Prog. 1.7

1045

Burn end off four steel containers.

5/10/51

B

J-3

1046

Remove two fission fragment cameras,

5/11/51

0D,B J3

1047

Install three flood lights on pole.

5/11/51

B

1048

Furnish crane to load & unload trailer,

5/13/51 V,E NRLH

1049

Supply water to photo trailer, Sta.132b.

5/11/51

E

NRLK

1050

Furnish rigging and welding.

5/11/51

£

NRLK

1051

Change backfill; restore radiation shield 5/3/51

£E

NRLK

1052

Assist in constructing Ganex shield and

5/11/51

£

NRLK

1053

Furnish 200 feet angle iron; 1 key hole
saw,

5/11/51

&

NRLK

1054

Remove & process spheres, chassis and

5/11/51 L,D

SEN 2,0

1055

Furnish 4 laborers to help remove equip.

5/12/51

V

NRLK

1056

Revise instrument rack.

5/12/51

B

operation.

collimator,

cylinders,

UCRL

supplement

17-61

Select target paragraph3