JOB 5 WORK ORDERS (Continued)
AEC
W,0,No.
Description
Date
Issued
1037
Furnish pump man; erect 2 tents w/frames. 5/5/51
1038
Repair Remington Typewriter.
Site
OD
5/7/5.
User
TU 3.1.5
SBN 2,0
1039 * Dismantle & move photo tower from M to B. 5/7/51
M
EG&G
1040
Move two thermal stations & Onan generate, 5/8/51
L
SEN 2,0
1041
Provide cat & trailer for clean-up opera- 5/10/51 B,N
tions,
EG&G
1042
Furnish crane & operator for recovery
5/10/51
&
Prog. 1.7
1043
Furnish labor to assist in recovering
material,
5/10/51
V
NRLK
1044.
Furnish bulldozer and operator.
5/10/51
D
Prog. 1.7
1045
Burn end off four steel containers.
5/10/51
B
J-3
1046
Remove two fission fragment cameras,
5/11/51
0D,B J3
1047
Install three flood lights on pole.
5/11/51
B
1048
Furnish crane to load & unload trailer,
5/13/51 V,E NRLH
1049
Supply water to photo trailer, Sta.132b.
5/11/51
E
NRLK
1050
Furnish rigging and welding.
5/11/51
£
NRLK
1051
Change backfill; restore radiation shield 5/3/51
£E
NRLK
1052
Assist in constructing Ganex shield and
5/11/51
£
NRLK
1053
Furnish 200 feet angle iron; 1 key hole
saw,
5/11/51
&
NRLK
1054
Remove & process spheres, chassis and
5/11/51 L,D
SEN 2,0
1055
Furnish 4 laborers to help remove equip.
5/12/51
V
NRLK
1056
Revise instrument rack.
5/12/51
B
operation.
collimator,
cylinders,
UCRL
supplement
17-61