JOB 5 WORK ORDERS (Continued)
AEC
W,0,No,
Description
Date
Issued _Site
User
1017
Complete and return cable record forms.
5/4/51
B
D-3,TG 3.2
1018
Relocate tent and install cots.
5/4/51
V
All Users
1019
Request for equip. operators & mechanic,
5/4/51
B,V
1020
Polish seat in high pressure autoclave,
5/4/51
CMR
1021
Furnish labor to assist in insertion &
5/4/51
Prog.1.5.2
1022
Fabricate and install six pipe stakes.
5/4/51
NBS
1023
Provide nine pieces of plywood.
5/4/51
NBS
1024
Remove and relocate limonite covers,
5/5/51
NBS
1025
Modify sample can covers.
5/5/51
LASL 3.1.1
1026
Furnish & deliver to Sta, 6A 80 16!
5/4/51
1027
Furnish 200 feet of sash chain.
5/5/51
1028
Weld broken pulley for generator PE-95.
5/5/51
1029
Relocate Station 73b.
5/5/51
1030
Install elec. wiring & fixtures at
5/5/51
1031
Manufacture ten coax fittings of brass,
5/5/51
1032
Locate & recover crusher gages at mise,
5/5/51
NOEL
1033.
Place 2 cubic yards of sand at each
5/7/51
NOEL
1034
Seal off 2 open end pipes within Sta. 313, 5/7/51
Prog.6.10
1035
Recover & relocate & pipes; drive 16
5/7/51
NBS
1036
Assist in setting detonators and plac-
5/7/51
17-60
stations.
Station 36,
pipes.
ing film.
by
wo
NBS
w
JTF-3
<<
Station 144.
NRLH
2.5.5.5
~y
timbers,
NRLK
By
recovery.
D3
NRLK
DE
NBS