JOB 5 WORK ORDERS (Continued)
AEC
W,0,No,

Description

Date

Issued _Site

User

1017

Complete and return cable record forms.

5/4/51

B

D-3,TG 3.2

1018

Relocate tent and install cots.

5/4/51

V

All Users

1019

Request for equip. operators & mechanic,

5/4/51

B,V

1020

Polish seat in high pressure autoclave,

5/4/51

CMR

1021

Furnish labor to assist in insertion &

5/4/51

Prog.1.5.2

1022

Fabricate and install six pipe stakes.

5/4/51

NBS

1023

Provide nine pieces of plywood.

5/4/51

NBS

1024

Remove and relocate limonite covers,

5/5/51

NBS

1025

Modify sample can covers.

5/5/51

LASL 3.1.1

1026

Furnish & deliver to Sta, 6A 80 16!

5/4/51

1027

Furnish 200 feet of sash chain.

5/5/51

1028

Weld broken pulley for generator PE-95.

5/5/51

1029

Relocate Station 73b.

5/5/51

1030

Install elec. wiring & fixtures at

5/5/51

1031

Manufacture ten coax fittings of brass,

5/5/51

1032

Locate & recover crusher gages at mise,

5/5/51

NOEL

1033.

Place 2 cubic yards of sand at each

5/7/51

NOEL

1034

Seal off 2 open end pipes within Sta. 313, 5/7/51

Prog.6.10

1035

Recover & relocate & pipes; drive 16

5/7/51

NBS

1036

Assist in setting detonators and plac-

5/7/51

17-60

stations.

Station 36,

pipes.

ing film.

by
wo

NBS

w

JTF-3

<<

Station 144.

NRLH

2.5.5.5

~y

timbers,

NRLK

By

recovery.

D3

NRLK

DE

NBS

Select target paragraph3