JOB 5 WORK ORDERS (Continued)
AEC
W.0,No.

Description

Date

Issued Site

User

488

Level ang pave around various stations.

3/19/51

489

Furnish electrical materials & plywood.

3/19/51

B,

490

Furnish misc, carpentry & welding.

3/19/51

E

UCRL

491

Insulate cable in switch box, Bldg. 232.

3/19/51 B

UCRL

492

Place steel pegs in concrete base at

3/19/51

1.7

493

Install water facilities in Radiological

3/19/51

5.1

494

Reproduce forms in 120 copies.

3/19/51

Proj. 4.1

495

Install 1/2" pipe curtain rod in Bldg.

3/19/51

3.16

496

Request for 100' of galvanized steel

3/19/51

1.7

497

Furnish air compressor to dry coaxial

3/19/51

NRLH

498

Supply pipe, plywood sheets and disks.

3/19/51

NBS

499

Replace time switches w/manual switches,

3/19/51

500

Supply labor to recover collimator
cameras,

3/19/51

501

Supply surveyors & electrician for

3/19/51

1.5.2

502

Construct and mount small wood shelf.

3/19/51

D-3

503

Remove fence; move elect. equip.;

3/19/51

NOBL

504

Deliver 24 feet of 1/2 inch brass angle,

3/19/51

SEN 2.4

505

Make two wooden signs.

3/19/51

Proj. 5.1

506

Furnish carpenter to construct cable

3/19/51

NRLK

210.

pipe.

mise, work.

install phone,

clamp.

E

we

lines,

V

Or

Lab,

E,

K

e

various Stas,

E

NOEL
EG&G

Dm2

1.5.2

17-33

Select target paragraph3