JOB 5 WORK ORDERS (Continued)
AEC

W,0,No,

Description

Date

Issued

Site

User

469

Furnish portable shower, tent, & shelving. 3/16/51

B

RAD SAFE

470

Provide two lead shielded cargo trucks.

3/16/51

B

TU. 3.1.1

471

Supply 40 ozalid each, of 7 sheets,

3/17/51

B

D-3,TG 3.1

472

Furnish electrician to move outlet

3/17/51

EB

NRLK

473

Furnish labor & materials for valve

3/17/51

B

UCRL

474

Supply 8 pieces of plywood, 16" square.

3/17/51

B

475

Request for 200 wood strips.

3/17/51 C,E NBS

476

Request for three pieces of canvas.

3/16/51

B

Proj. 4.2

477

Sheet Metal Shop to make two film

3/17/51

B

TU 3.1.6

478

Supply 1 single line switch box and 12

3/17/51

C

NBS

479

Mfgr. & install rank plate brackets on
vehicles,

3/16/51

B

JTF-3

480

Install double electrical convenience

3/17/51

B

JTF-3

481

Furnish labor for erecting panels and

3/17/5. E

6.2

482

Make sign for J~3 Division.

3/16/51

JTF-3

483

Fabricate three cadmium shields.

3/17/51 L

SBN 2.4

484

Crew of four to do work for indefinite

3/ /51

NOBL

485

Modify auxiliary generator installation.

3/17/51 E,S Proj.8.2

486

Build plywood base mounting for calculea-

3/17/51

B

CTG 3-1,

487

Dig hole about 18" diameter and 27" deep, 3/19/51

B

Proj.5.1

17-32

Station 1444,

seat rings.

hangar racks,

6 Amp fuses,

outlet.

structures,

period.

tors,

B
E,

C,D

NBS

J=-7

Select target paragraph3