JOB 5 WORK ORDERS (Continued)
AEC
W,0,No,
Description
Date
Issued
Site
User
469
Furnish portable shower, tent, & shelving. 3/16/51
B
RAD SAFE
470
Provide two lead shielded cargo trucks.
3/16/51
B
TU. 3.1.1
471
Supply 40 ozalid each, of 7 sheets,
3/17/51
B
D-3,TG 3.1
472
Furnish electrician to move outlet
3/17/51
EB
NRLK
473
Furnish labor & materials for valve
3/17/51
B
UCRL
474
Supply 8 pieces of plywood, 16" square.
3/17/51
B
475
Request for 200 wood strips.
3/17/51 C,E NBS
476
Request for three pieces of canvas.
3/16/51
B
Proj. 4.2
477
Sheet Metal Shop to make two film
3/17/51
B
TU 3.1.6
478
Supply 1 single line switch box and 12
3/17/51
C
NBS
479
Mfgr. & install rank plate brackets on
vehicles,
3/16/51
B
JTF-3
480
Install double electrical convenience
3/17/51
B
JTF-3
481
Furnish labor for erecting panels and
3/17/5. E
6.2
482
Make sign for J~3 Division.
3/16/51
JTF-3
483
Fabricate three cadmium shields.
3/17/51 L
SBN 2.4
484
Crew of four to do work for indefinite
3/ /51
NOBL
485
Modify auxiliary generator installation.
3/17/51 E,S Proj.8.2
486
Build plywood base mounting for calculea-
3/17/51
B
CTG 3-1,
487
Dig hole about 18" diameter and 27" deep, 3/19/51
B
Proj.5.1
17-32
Station 1444,
seat rings.
hangar racks,
6 Amp fuses,
outlet.
structures,
period.
tors,
B
E,
C,D
NBS
J=-7