JOB 5 WORK ORDERS (Continued)
AEC
W.0,No.
Description
Date
Issued Site
User
488
Level ang pave around various stations.
3/19/51
489
Furnish electrical materials & plywood.
3/19/51
B,
490
Furnish misc, carpentry & welding.
3/19/51
E
UCRL
491
Insulate cable in switch box, Bldg. 232.
3/19/51 B
UCRL
492
Place steel pegs in concrete base at
3/19/51
1.7
493
Install water facilities in Radiological
3/19/51
5.1
494
Reproduce forms in 120 copies.
3/19/51
Proj. 4.1
495
Install 1/2" pipe curtain rod in Bldg.
3/19/51
3.16
496
Request for 100' of galvanized steel
3/19/51
1.7
497
Furnish air compressor to dry coaxial
3/19/51
NRLH
498
Supply pipe, plywood sheets and disks.
3/19/51
NBS
499
Replace time switches w/manual switches,
3/19/51
500
Supply labor to recover collimator
cameras,
3/19/51
501
Supply surveyors & electrician for
3/19/51
1.5.2
502
Construct and mount small wood shelf.
3/19/51
D-3
503
Remove fence; move elect. equip.;
3/19/51
NOBL
504
Deliver 24 feet of 1/2 inch brass angle,
3/19/51
SEN 2.4
505
Make two wooden signs.
3/19/51
Proj. 5.1
506
Furnish carpenter to construct cable
3/19/51
NRLK
210.
pipe.
mise, work.
install phone,
clamp.
E
we
lines,
V
Or
Lab,
E,
K
e
various Stas,
E
NOEL
EG&G
Dm2
1.5.2
17-33