JOB 5 WORK ORDERS (Continued)
AEC
W.0, No,

Description

Date
Issued Site

User

LASL

85

Erect two 14' x 14! tents near Stations

2/7/51

86

Surveying, stabilization, concrete &

2/7/51.

87

Requisition for canvas.

2/6/51

E,C

NBS

88

Construct

2/7/51

C

NBS

89

Dig trenches between stations.

2/6/51

iE

_NBS

90 *

Dig trenches and pull cable.

2/6/51

NBS

91

Stabilize the floor areas of tents

2/7/51

C

NBS

92

Request for stabilization & excavation.

2/7/51

=:

NBS

93

Install butane gas and remodel Bldg. 212A. 2/8/51

B

LASL

94

Provide materials & construct vehicle

2/7/51

B

Sandia

95

Construct rough benches and cutty stool

2/8/51

C

NRLK

96

Furnish cherry picker for 30 days.

2/8/51

97

Requisition for metal stock.

2/9/51

98 *

Perform maint. on dehumidification

2/9/51

99

Manufacture one set of shelves,

2/8/51.

«iB

100

Alterations to Building No. 222.

2/8/51

iB

101

Repair of Friden & Monroe Calculators.

2/9/51

iL

2.1

102

Install hasps and locks on Building 211.

2/9/51

B

Prog. 3

103

Requisition for labor, material, and

2/9/51

E

*

Supplements,

17-12

123.

equipment.

four wedge-shaped platforms.

#5928, #592c.

"A" frame,

as required at Sta, 6a,

units, etc,

services,

E,V

4.2

E,S Prog.3.4
B

LASL

ALL All Users

NBS

Select target paragraph3