JOB 5 WORK ORDERS (Continued)
W.0, No,

Description

Date

Issued Site User

64

Furnish labor & material for scaffold &

2/3/51

E

NALK

65

Requisition for labor and material.

2/3/51

E

NRLK

66

Provide bulletin boards, signs, incin-

2/2/51

B

JTF-3

67

Equipment and labor requisition.

2/3/51

M

All Users

68

Labor requisition.

2/3/51

E

NBS

69

Furnish and install hasp and locks.

2/3/51

E

NBS

70

Furnish and install hasp and locks.

2/3/52

C

NBS

71

Labor requisition.

2/8/51

B

LASL

72

Labor requisition; install bolt and lock. 2/5/51

B

NRLK

73

Modify eight welding head fixtures.

2/4/51

None

NRLK

7h

Erect 14' x 28! tent over Tomb.

2/5/51

c

NBS

75

Erect temporary scaffold at 25! level

2/5/51

E

NRLK

76

Construct and place wooden coax braces,

2/5/51

E

NRLK

77

Labor requisition.

2/5/51

L

2.3

78

Locate and dig ditches; lay cable.

2/5/51

C

NOBL

79

Labor requisition,

2/5/51

E

NRLK

80

Modify 4" double strength steel pipe

2/6/51

B

4.2

81

Move and place eight limonite concrete

2/6/51

E,¢

82

Furnish and install small air compressor,

2/6/51

B

LASL

83

Construct storage locker for drill press, 2/ /51

B

LASL

84

Construct work bench & install duplex

brackets.

erator.

on tower,

support,

blocks.

outlets,

1.5.1

2/7/51 E,C,D NOBL
17-11

Select target paragraph3