JOB 5 WORK ORDERS (Continued)
W.0, No,
Description
Date
Issued Site User
64
Furnish labor & material for scaffold &
2/3/51
E
NALK
65
Requisition for labor and material.
2/3/51
E
NRLK
66
Provide bulletin boards, signs, incin-
2/2/51
B
JTF-3
67
Equipment and labor requisition.
2/3/51
M
All Users
68
Labor requisition.
2/3/51
E
NBS
69
Furnish and install hasp and locks.
2/3/51
E
NBS
70
Furnish and install hasp and locks.
2/3/52
C
NBS
71
Labor requisition.
2/8/51
B
LASL
72
Labor requisition; install bolt and lock. 2/5/51
B
NRLK
73
Modify eight welding head fixtures.
2/4/51
None
NRLK
7h
Erect 14' x 28! tent over Tomb.
2/5/51
c
NBS
75
Erect temporary scaffold at 25! level
2/5/51
E
NRLK
76
Construct and place wooden coax braces,
2/5/51
E
NRLK
77
Labor requisition.
2/5/51
L
2.3
78
Locate and dig ditches; lay cable.
2/5/51
C
NOBL
79
Labor requisition,
2/5/51
E
NRLK
80
Modify 4" double strength steel pipe
2/6/51
B
4.2
81
Move and place eight limonite concrete
2/6/51
E,¢
82
Furnish and install small air compressor,
2/6/51
B
LASL
83
Construct storage locker for drill press, 2/ /51
B
LASL
84
Construct work bench & install duplex
brackets.
erator.
on tower,
support,
blocks.
outlets,
1.5.1
2/7/51 E,C,D NOBL
17-11