JOB 5 WORK ORDERS (Continued)
AEC
W.0, No,
Description
Date
Issued Site
User
LASL
85
Erect two 14' x 14! tents near Stations
2/7/51
86
Surveying, stabilization, concrete &
2/7/51.
87
Requisition for canvas.
2/6/51
E,C
NBS
88
Construct
2/7/51
C
NBS
89
Dig trenches between stations.
2/6/51
iE
_NBS
90 *
Dig trenches and pull cable.
2/6/51
NBS
91
Stabilize the floor areas of tents
2/7/51
C
NBS
92
Request for stabilization & excavation.
2/7/51
=:
NBS
93
Install butane gas and remodel Bldg. 212A. 2/8/51
B
LASL
94
Provide materials & construct vehicle
2/7/51
B
Sandia
95
Construct rough benches and cutty stool
2/8/51
C
NRLK
96
Furnish cherry picker for 30 days.
2/8/51
97
Requisition for metal stock.
2/9/51
98 *
Perform maint. on dehumidification
2/9/51
99
Manufacture one set of shelves,
2/8/51.
«iB
100
Alterations to Building No. 222.
2/8/51
iB
101
Repair of Friden & Monroe Calculators.
2/9/51
iL
2.1
102
Install hasps and locks on Building 211.
2/9/51
B
Prog. 3
103
Requisition for labor, material, and
2/9/51
E
*
Supplements,
17-12
123.
equipment.
four wedge-shaped platforms.
#5928, #592c.
"A" frame,
as required at Sta, 6a,
units, etc,
services,
E,V
4.2
E,S Prog.3.4
B
LASL
ALL All Users
NBS