JOB 5 WORK ORDERS (Continued)
AEC
W,0, No,
Description
Date
Issued Site
User
NBS
104
Requisition for labor, material and
2/9/51
C
105
Paint and install two signs.
2/9/51
3B
NOBL
106
Construct and install shelf and rack.
2/9/51
B
NOBL
107
Install relay on receptable circuits
2/9/51
B
LASL
108
Install power in Station 133.
2/10/51
E
UCRL
109
Manufacture mail distribution box.
2/8/51
B
JTF-3
110
Make & install table shelf & 6 book
2/7/5.
B
JTF-3
111
Repair typewriters.
2/10/51
L
Med-Bio
112
Construct four lockers of plywood.
2/10/51
B
NRLK
113
Install add. shelving & socket type
2/10/51
B
NRLK
114
Erect 14' x 28! tent over vault.
2/10/51
E
NBS
115
Install temporary field wire, and
2/10/51
E
NBS
116
Install temporary field wire, and
2/10/51
C
NBS
117
Erect fourtents, 16' x 32',
2/12/51 E,V NRLK
118
Manufacture one spring tension gauge.
2/10/51
119
Erect work benches; make dry boxes
2/10/51 E,D UCRL
120
Pour cement pad; erect work bench,
2/10/51 E,V, UCRL
121
Make bench; install outlets; stabilize floor.
2/12/51
E
NOBL
122
Manufacture three sheet metal
2/12/51
B
JTF-3
services,
in Bldg. 212A,
shelves.
outlets,
telephone,
telephone,
and shelves,
dry box, shelf.
messages trays,
B
NRLK
D
‘17-13