Opere tion

ley marker buoys end conduct LOU survey of certain arees

7.3.7

(8)

ender direct suppert to Project 1.6 with modified LOM

7307

(9)

Transport leaded dummy device barge from PARKY {sland

LSD.of

Transport leaded dummy device barge from shot site te

LSD of

Commence laying moorings for Project 1.4, 8 Feb.

703 05%

Conduct rehearsal of cloud sampling eircreft eperations

7.30

Conduet rehearsal of drone ship operations with eontrol

7,346

(1b)

Commence instrumentation of Yroject 1.4,

70305

(1§)

Conduct eirborne tests of Project 1,4 telemetering,

72303

(1@)

(11)
(22)

(18)

to shot site

7309

Vesel

while underway
fron aircraft,

(16) Transport shot barge londed with speeial device to shot

LSD of

(19)

70307

;

Commence evacuation of trailers from shot site,

Shot setivities,
&,

7039

PARRY Islend,

site.

5»

pull

(9)

including

70309

eua th

The Shot and Evacuation 2hase will commence ebout six (6) arys prior

to the fisst scheduled shot and will continue until ebout three (3) deys

after the final shot,

freeshot evacuntion of all or nearly all personrel,

and novenent of verying quantities of equipment, will te required for each
ehot et BIKINI atoll, No general personnel evecuetion nor extensive movement
of equipment is planned prior to the scheduled shot et EXIWETOK atoll, dn
energency post-shot evacuation of personnel fron the non~shot Atoll may be
required,
bd. ALL ships, except those required at the non—involved Atoll, will go
to sea prior to each shot and will remedn at sea until efter the saot is de-

tonated and redioleciaal conditions pernit safe reentry,

Boats and craft

will be loaded on the LSD, or go to sea, or be beached or anehored in safe
loealities 4y the lagoon in deep water for each shot at the affected Atoll,

_

bel

CNA
95