fd

~~

~

Operation Pian

CTG 7.3 No, 1-53

sat
pe
|

SHIP

|
| R
Bout POOL LC
DIEGO
S.N DIEGO
Rehelon| SAN
ast Echelon!
2nd
|

3rd Echelon SN DIEGO

:

E
E
E
’
RIVE

PLACE
DATE
10-17-53 ENIWETOK
10-453 _ ENIWETOK
1-2-5

—_ BIXINT

‘DATs || REMARKS
«11-253 .& LOM in USS COLONIA
1 12-2-53 2 10U, 12 LCM wie
;
‘pr, MARION &

. |QUNSTON HALL

"1-20-54BELLE
itn

Ships and units are expected to be sailed to the forward syea by type econ-

uanders ey other eommenders having eperational rontrol, and to repert to CIG

703 fer operational control as directed, generally upon eressing the boundary
of the Banger Area,

4,

are.

a.

P

The Preparation Phase in the forward area commences on 16 January

with the arrival ef the first saTF with the YCV and YFN, and is cheracterized
by eperatinns to prepare, transport and instrument the special device for
the first shet, and to rehearse the tasks which must be perforned immediately
wefore, during and efter this shot.

Certain specific eperations not involvisig

ell units nor contained in ether anmexes, will be performed during this

period and are listed with a designation of the performing unit in entieipeated ehronological order,

Ovevation

.

(1) Mooring ef YCV near shet site prier 17 Jan.
(2)

Mooring of YFN near LSD guoy at BIKINI prior
17 Jan.

(3) Plenting ef twenty queys for 10M moorings prior
20 Jan.

(4)
(5)
(6)

ay

ATF 9f 7.3.5
ATF of 7,325

Unit ef 7.3.5

Commence helicopter inter~island transportetios
system at BIKINI 20 Jan,

7e3e2

Commence beat paol inter~island transportation

7307

systen at BIKINI 22 Jax,

Yosition and assist in instrumentation of lagoon
falleout rafts of Projoeta 2,58

.

90305
70307

94

Select target paragraph3