ae GEE Operetion Plan CTG 7.3 Noy 1-53 5» Commender Transport Unit shell perforn the follewing tasks} (1) Trensport the special devices and the necessary barges and associated personnel between and within ENIVWETOK and BIKINI steolls, as dir— ected, (2) Provide shipboard facilities for pre-shot eveeuation of Task Force personnel for BIKINI Atoll, (3) Provide afloat barracks accormodations end administrative space in Personnel Transport Element for TG 7,5 during BIKINI operetions. dppendix II to Annex C), (See PEE heeSe tevin ob: ea TOT mare nny te x, (1) This operation plen is effective for plenning purposes on receipt and is effective for all units upon reporting to CTG 7.3 for operation~ al control, Commanding Officers of all ships and units are required to be thoroughly familiar with CJTF SEVEN OpPlan 3-53 to insure intelligent per— formance cf assigned tasks, nulgated for each shot, i: seperate CTG 7,3 Operation order will be pro- (2) All units, except VP-29, shell be prepared to provide working parties to assist Commander aW Ship Countermeasures Test Unit. (3) Commander Carrier Unit and Counander Jpint Task Force Flagship Unit will provide and maintein recreation facilities for TG 7.3 personnel at their respective bases, (4) #11 units heving organized landing forces te prepered to land (5) «sll units shall provide for the radiological sefoty of all en- such to assist in ground defense of ENIWETOK and BIKINI Atolls, if se dir— ected, barked Task Ferce personnel, (é) All waits shall be prepared to provide emergency post—shot evacuation of all personnel from toth atolls fer a period of less than 48 hours, <A detailed plan to cover this contingency will be promulgated before the shot period, ae S 20 37