i
Operetion Plan
CTG 7.3 No, 1-53

j»

Conmender Transport Unit shall perform the follewing tasks}

(1) Trensport the special devices end the necessary barges and
associated personnel between and within ENIWETOK and BIKINI stolls, as directed,

(2)

Provide shipboard facilities for pre-shot evreuation of Task

(3)

Provide afloat barracks accommodations and administrative space

Force personnel for BIKINI Atoll,

in Personnel Transport Elenent for TG 7,5 during BIKINI operetions.
Appendix II to Annex C),

(Sse

(2) Transport test inert mines to forward area,

[

(3) Determine plans of participation of Project 3.4 in barge shots,
(4) Plant mines prior to barge shots.
(5) Recover, examine and record data on mines.

a tte

(6) Provide for radiological safety of TE 7.3.7¢2, TE 7.30703 and
TE 7.3eTohe
\a/]

wan uw

(5)

«ll units shall provide for the radiological safety of all em

(é)

All waits shall be prepared to provide emergency post—shot

such to assist in ground defense of ENIWETOK and BIKINI Atoils, ir 39 mr—
ected,

|

i
i

barked Task Ferce personnel,

NA

evacuation of all personnel from toth atolls for a period 9f less than 48
hours, <A detailed plan to cover this contingency will be promulgated befere
the shot period,

ee

2

x6

Select target paragraph3