FIELD SKETCHES (Continued)

FIELD
SKETCH
NO.

REVIS~
ION
NO.

DESCRIPTION

DATE

393

Electric Service for Bldg. 3, Location "L"

1-16~51

394

Personnel Pier Landing, Location "A"

1-17-51

395

Water Rheostat Tank

1-18~51

396

Revision to Guy Cable Anchors, 200-Ft. Tower,

397

Laundry Extension, Location "B"

1-20-51

398

Control Cable Terminal Markings (5 Sheets)

1-19-51

399

Laboratory, Bldg. 12, Location "L®

1-20-51

400

Revision to Photo Room, Bldg. 90, Location "A"

1-23-51

401

Telephone Jack Shelter

1-23-51

402

Concrete Slab Addition to Photo Laboratory,

403

Addition of Louvered Wall to Bldg. 330,

404

Material Storage Zones, Location "B"

405

Street Light Installation & Service Bd.

406

Field Sketch for Drawing 7E-094, Sta. 132 Area,

407

Field Sketch for EXO Schedule, Drawing 7E-094,
Location "E"

408

Open Air Theatre, Latrines, Bldgs. 30 & 108,

409

Pier & Boathouse Lighting, Location "L"

410

Manometer & Thermocouple Connections to be

Location "KE" 4

Bldg. 210, Location "B"

Location "B"

Revision, Infirmary, Location "L"
Location "E"

Location "A"

Installed on Generator Units, Locations "C4, "D",
& "EW

1-18-51

1-23-51
1-23-51

1-24-51
1-25-51
1-25-51
1-25-51
1-25-51

1-26-51

1-26-51

411

Operation Chart for Testine Data, Generator Units,
Locations "C", "D", & "E"

1-26-51

412

Concrete Grease Pit Location "E"

1-26-51
107

Select target paragraph3