FIELD SKETCHES (Continued) FIELD SKETCH NO. REVIS~ ION NO. DESCRIPTION DATE 393 Electric Service for Bldg. 3, Location "L" 1-16~51 394 Personnel Pier Landing, Location "A" 1-17-51 395 Water Rheostat Tank 1-18~51 396 Revision to Guy Cable Anchors, 200-Ft. Tower, 397 Laundry Extension, Location "B" 1-20-51 398 Control Cable Terminal Markings (5 Sheets) 1-19-51 399 Laboratory, Bldg. 12, Location "L® 1-20-51 400 Revision to Photo Room, Bldg. 90, Location "A" 1-23-51 401 Telephone Jack Shelter 1-23-51 402 Concrete Slab Addition to Photo Laboratory, 403 Addition of Louvered Wall to Bldg. 330, 404 Material Storage Zones, Location "B" 405 Street Light Installation & Service Bd. 406 Field Sketch for Drawing 7E-094, Sta. 132 Area, 407 Field Sketch for EXO Schedule, Drawing 7E-094, Location "E" 408 Open Air Theatre, Latrines, Bldgs. 30 & 108, 409 Pier & Boathouse Lighting, Location "L" 410 Manometer & Thermocouple Connections to be Location "KE" 4 Bldg. 210, Location "B" Location "B" Revision, Infirmary, Location "L" Location "E" Location "A" Installed on Generator Units, Locations "C4, "D", & "EW 1-18-51 1-23-51 1-23-51 1-24-51 1-25-51 1-25-51 1-25-51 1-25-51 1-26-51 1-26-51 411 Operation Chart for Testine Data, Generator Units, Locations "C", "D", & "E" 1-26-51 412 Concrete Grease Pit Location "E" 1-26-51 107