FIELD SKETCHES (Continued)
FIELD
SKETCH
NO,

REVIS~
ION
NO,

DESCRIPTION

DATS

413

Additional Outlets, Autopsy Bldg.,

414

Temporary floor for Station 13la,
Location "EY & "Vy"

1-27-51

Al5

Piping Details, Power & Water Distillation Plant,
Station 100, Location "Cc"

1-27-51

416

Reinforcing Steel Shop, Bldg. 96, Location "E"

1-27-51

417

Plans & Details of Entryway, Station 120 a toe,
Locations "EK" & "V", 12la to e

1-29-51

418

Plan & Elevations, Construction Office, Bldg. 97,

419

Causeway for Coax Cables

1-29-51

420

Plans, Elevations, & Sections, Carpenter Shop,
Location "E"

1-30-51

421

Plan Elevation & Section, A.E.C. Instrument

422

Wedge Assembly, Station 11 Collimator Block

423

Isometric Piping Layout, Typical Diesel Generator

424,

Reefer, 100~-Man Mess Hall, Bldg. 104, Location "D"

425

Addition to P.X., Barber Shop, & Snack Bar,

426

Rewiring of Existing Shop, Bidg. 3, Location "L"

2-1-5:

427

Paint & Tool Shed, Bldg. 121, Location "C"

2-1-51

428

Concrete Tool Shed, Plan, Elevation, Section, &

42g

Temporary 50' x 100' Warehouse, Bldg. 2,
Location "E"

2-1-5.

430

Diesel Lube Oil & Fuel Oil Piping,
Locations "C", "Dt, & aE"

2-3-5

431

Timekeeper's Office & Fire Station, Location "E"

2-3-51

108

Location "L"

Location "E"

Warehouse, Location "E"

Unit, Location "C", "Dp" @ mgm

Location "B"

Electrical Details, Location "E"

1-26-51

1-29-51

1-31-51
1-30-5]

1-31-53
1-31-51

1-31-5:

2-1-5.