FIELD SKETCHES (Continued) FIELD SKETCH NO, REVIS~ ION NO, DESCRIPTION DATS 413 Additional Outlets, Autopsy Bldg., 414 Temporary floor for Station 13la, Location "EY & "Vy" 1-27-51 Al5 Piping Details, Power & Water Distillation Plant, Station 100, Location "Cc" 1-27-51 416 Reinforcing Steel Shop, Bldg. 96, Location "E" 1-27-51 417 Plans & Details of Entryway, Station 120 a toe, Locations "EK" & "V", 12la to e 1-29-51 418 Plan & Elevations, Construction Office, Bldg. 97, 419 Causeway for Coax Cables 1-29-51 420 Plans, Elevations, & Sections, Carpenter Shop, Location "E" 1-30-51 421 Plan Elevation & Section, A.E.C. Instrument 422 Wedge Assembly, Station 11 Collimator Block 423 Isometric Piping Layout, Typical Diesel Generator 424, Reefer, 100~-Man Mess Hall, Bldg. 104, Location "D" 425 Addition to P.X., Barber Shop, & Snack Bar, 426 Rewiring of Existing Shop, Bidg. 3, Location "L" 2-1-5: 427 Paint & Tool Shed, Bldg. 121, Location "C" 2-1-51 428 Concrete Tool Shed, Plan, Elevation, Section, & 42g Temporary 50' x 100' Warehouse, Bldg. 2, Location "E" 2-1-5. 430 Diesel Lube Oil & Fuel Oil Piping, Locations "C", "Dt, & aE" 2-3-5 431 Timekeeper's Office & Fire Station, Location "E" 2-3-51 108 Location "L" Location "E" Warehouse, Location "E" Unit, Location "C", "Dp" @ mgm Location "B" Electrical Details, Location "E" 1-26-51 1-29-51 1-31-51 1-30-5] 1-31-53 1-31-51 1-31-5: 2-1-5.