FIELD SKETCHES (Continued) FIELD SKETCH NO, REVIS— ION NO, DESCRIPTION DATE 372 Salt Water Pump, Well, & Piping Scheme, P&D, 373 Sea Air xescue Map, Eniwetok Atoll 12-11-5C 374 Cargo Pier Lighting, Location "B" 12-14-50 375 Quarters, Bldg. 51, Location "L" 12-15-5C 376 Projection of Sleeves in Foot of Station 131 to 300 ft. Tower Face, Location "E" 12-15-5C 377 Warehouse Office for T.G, 3.1, Location "B" - 12-22-50 378 Addition to 4.E.C. Administration Bldg., Bldg. 209, Location "™B" 12-21-50 379 Operation Shack, Location B, C, D&E 12-22-5C 380 Auxiliary Salt Water Pump Station, Power Plant, 381 Airstrip Mooring Details, Locations "B", "C", "D4, & "EN 12-23—5C 382 Recreation Building, Bldg. 237, Location "5B" - 12-27-50 383 Addition to Seullery, Bldg, 201, Location "B" L2—-27—5C 384 Loran Building, Location "A", Installation of Cross Connection Fuel Lines 1-3-51 385 Navigational Aids, Locations "C", "D", & "ES 1-3-51 386 Addition to Mess Hall Galley & Bakery, 387 Proposed Layouts, Snack Bar, P.X., P.0., Shoe & Barber Shop, Location "BY 388 Proposed Repair to Personnel Pier, Location "A" 12-5-5C 389 Alteration to Quonset, Location "B" 1-11-51 390 Precase Ring for Adj. Manholes to Grade 391 Proposed method for Construction of Triangular Pier 11-1-49 392 Addition to Laundry Building, Location "B® 1-16-51 : 106 Bldg. 56 = Location "A" Location "A" Location "B" 12-9-56 12-22-5C 1-5-51 1-9-51 1-8-5]