FIELD SKETCHES (Continued)
FIELD

SKETCH
NO,

REVIS—
ION
NO,

DESCRIPTION

DATE

372

Salt Water Pump, Well, & Piping Scheme, P&D,

373

Sea Air xescue Map, Eniwetok Atoll

12-11-5C

374

Cargo Pier Lighting, Location "B"

12-14-50

375

Quarters, Bldg. 51, Location "L"

12-15-5C

376

Projection of Sleeves in Foot of Station 131
to 300 ft. Tower Face, Location "E"

12-15-5C

377

Warehouse Office for T.G, 3.1, Location "B" -

12-22-50

378

Addition to 4.E.C. Administration Bldg.,
Bldg. 209, Location "™B"

12-21-50

379

Operation Shack, Location B, C, D&E

12-22-5C

380

Auxiliary Salt Water Pump Station, Power Plant,

381

Airstrip Mooring Details, Locations "B", "C", "D4,
& "EN

12-23—5C

382

Recreation Building, Bldg. 237, Location "5B" -

12-27-50

383

Addition to Seullery, Bldg, 201, Location "B"

L2—-27—5C

384

Loran Building, Location "A", Installation of
Cross Connection Fuel Lines

1-3-51

385

Navigational Aids, Locations "C", "D", & "ES

1-3-51

386

Addition to Mess Hall Galley & Bakery,

387

Proposed Layouts, Snack Bar, P.X., P.0.,
Shoe & Barber Shop, Location "BY

388

Proposed Repair to Personnel Pier, Location "A"

12-5-5C

389

Alteration to Quonset, Location "B"

1-11-51

390

Precase Ring for Adj. Manholes to Grade

391

Proposed method for Construction of Triangular Pier

11-1-49

392

Addition to Laundry Building, Location "B®

1-16-51

:

106

Bldg. 56 = Location "A"

Location "A"

Location "B"

12-9-56

12-22-5C

1-5-51

1-9-51

1-8-5]

Select target paragraph3