FIELD SKETGunS (Continued)

FIELD
SKETCH
eee

312

ss Low Water Indicator, Fresh Water Tank,
Location "B"

313

Air Force Structures, Footing Revisions

314

Fresh Water Pipe Line to outer end of cargo pler
for servicing T-Boats, Dry Dock, etc.,
Location "B®

(5 Sheets)

DATE

LOm750

Qual50
10=10=50

315

Relocation of Hot Watex Storage Tank in Laundry

316

Location of Condenser Unit & Louvered Ventilator
Photo Laboratory, Location "BY" —- 4 sheets

317

Addition of Auxiliary Boiler - Location "A"

318

septic Tank & Leaching Field Washroom Facilities,

319

Installation of Badger Units, Location "A"
(2 sheets)

10—12250

320

Water Lines to Camp Office, Location "B"
(2 sheets)

10=12~50

321

Foundation, 16" Heavy Duty Lathe, Machine Shop,

322

Replacing Drwuma under Personnel Pier Float

10=13=50

323

Plumbing Fixture Location, Shower cabinet

10=1B50

32k,

Badger Units at Power Plant, Location "A"

1L0—18-50

325

Construction Progress & Percent Completion

326

Extension of Personnel Pie: , Location "D"

1O212250

327

Table Top Desk, Isometric & Details

10—20—50

328

Door Lock, Film Pass Door, Bldg. 210,

329

Partition and Drainage, Warehouse, Bldg, 320

Boiler House, Location "A"

(2 sheets)

Bldg. 406, Location "B"

Location "B"

Report (6 sheets)

Location "B"

10—10=50
10—4=50
1L0m1L0050

10#11-50

1021350

10219=50

10.23—50
10—23—50

103