FIELD SKETCHES (Continued) FIELD SKETCH NO, 104 REVISION NO, DESCRIPTION DATE 330 Proposed road from Biijiri to Aomon Island 10-25-50 331 Root Storage Building, Location "B" 10-26-50 332 Revisions & Additions, Electrical Power Service 333 Revisions to Intake Ducts, Locations HON ap, & ug 334 Fire Hydrant & Hose Rack Sheds, P.O.L. Facilities, 335 Weights & Measures, Common Nails 336 Concrete Reservoir, Fresh Water Storage, Location "B" 11-1-5C 337 Addition to Power Plant, Location "B" 11-150 338 16-02. Copper Water Stop Detail 11-2-5C 339 Supply & Return Duct, Dehumidification Unit, 340 Replacement Clip Angles, Structure 3.3.3 11-3-50 341 P.O.L, Facilities, Additional Storage, Location "B" 11-6-50 342 Fixture Assembly, Station 80b, c, &d (Location "E") Station 80a, b, c, d, &e (Location "V") 11-7-5C 343 Sleeve for Final Collimating Tube, Station 54 11-8-5C 344 Detail Part No. D3, Structure 3.3.3 12-10-50 345 Wiring Diagram, Mill Type Overload Thermal & Instantaneous Trip 11-11-56 346 Floor Plans of Bldg. 3.3.5A 11-15-5C 347 Concrete Foundation for Kholer Electrical Plant, Loran Station J1-17-5C 348 Signal & Control Terminals, Locations 349 Cargo Pier, Location "L" Power, House, Location "D" Location "B" Station ]3la, Location "E" HBU ncn "pH , & wen 10-26-50 10-27-50 10-28-50 10-31-5C 11-3-5C 11-18-50 11-20-5C