FIELD SKETCHES (Continued)
FIELD
SKETCH

NO,

104

REVISION

NO,

DESCRIPTION

DATE

330

Proposed road from Biijiri to Aomon Island

10-25-50

331

Root Storage Building, Location "B"

10-26-50

332

Revisions & Additions, Electrical Power Service

333

Revisions to Intake Ducts, Locations
HON ap, & ug

334

Fire Hydrant & Hose Rack Sheds, P.O.L. Facilities,

335

Weights & Measures, Common Nails

336

Concrete Reservoir, Fresh Water Storage,
Location "B"

11-1-5C

337

Addition to Power Plant, Location "B"

11-150

338

16-02. Copper Water Stop Detail

11-2-5C

339

Supply & Return Duct, Dehumidification Unit,

340

Replacement Clip Angles, Structure 3.3.3

11-3-50

341

P.O.L, Facilities, Additional Storage,
Location "B"

11-6-50

342

Fixture Assembly, Station 80b, c, &d (Location "E")
Station 80a, b, c, d, &e (Location "V")

11-7-5C

343

Sleeve for Final Collimating Tube, Station 54

11-8-5C

344

Detail Part No. D3, Structure 3.3.3

12-10-50

345

Wiring Diagram, Mill Type Overload Thermal &
Instantaneous Trip

11-11-56

346

Floor Plans of Bldg. 3.3.5A

11-15-5C

347

Concrete Foundation for Kholer Electrical Plant,
Loran Station

J1-17-5C

348

Signal & Control Terminals, Locations

349

Cargo Pier, Location "L"

Power, House, Location "D"

Location "B"

Station ]3la, Location "E"

HBU

ncn

"pH ,

& wen

10-26-50
10-27-50

10-28-50
10-31-5C

11-3-5C

11-18-50

11-20-5C

Select target paragraph3