FIELD SKETCHES (Continued) FIELD SKETCH NO, 102 REVISION NO, DESCRIPTION DATE 289 General Layout, Small Scale, Location "L* 9-23-50 290 Proposed Addition, Power Plant, Location "B" 9-25-50 291 Additional Communication Requirements, TF Bldg., 292 Thermal Building, Location "L" 9-27-50 293 Description of Electrical Work 9-27-50 294 Aluminum Louvres, Crypto Vault, Bldg. 221, Location "3" 9-28-50 295 Proposed Horseshoe Pits, Location "B" 9-30-50 2% Construction Report (6 Sheets) 9-30-50 297 Proposed Layout, Location "L" 11-1-49 298 Proposed Theatre Shelter Extension, Location "B" 299 Bldg. 3.2.4.4 (Redrawing of Sheet #51214) 7-10-50 300 Recreation Department Chart 925-50 301 P.O.L. Facilities Foundation Layout, Location "B" 1-20-50 302 Monthly Construction Progress Chart 10-1-50 303 Sonstruction Chart 10-1-50 304 Cone Penetrometer, Soil Investigation 10-4-50 305 Hot Plate Exhaust Hood, Bldg. 309, Location "B® 10-4-56 306 Footing Revisions, Bldg. 3.3.4., Location "Ss" 307 Lighting for Personnel Pier, Location "B" 10-5-50 308 Float Well, Salt Water Tank, Location "B" 10-6-5C 309 Office Bldg. for Dispatcher & Guard, Locations 310 Drafting Room Stool 10-7-50 311 Lighting, Water Tanks, Location "B" 10-7-50 Site "B" nBM, WON, @ upM 9-26~50 9-1-50 9-6—50 10-7-50