TITLE

NO.

10.1

Computation of Total TRU Activity Removed from the
Hustead Area of Island Sally
Effeetive Area Factor for Detector SN 483

12.0

IMP Measurement Characteristics

13.0

Surface Sampling of Concrete Bunkers

14.0

Estimated TRU Content and Recommended Disposition

of Yvonne High-Grade Soil/Debris Stored in Hardtack Station 1610 Bunker

15.0

16.0

Activity Levels in Soil Stockpile on Yvonne Near
Southern Lip of Cactus Crater
Field Inspection of Grid Stakes and Portable

Instrument (PG-2) Survey of Fig/Quince Area on
Yvonne

17.0

Aomon Crypt IMP Measurement

18.0

Soil Sampling to Define the Boundaries of Subsurface
Activity

19.0

Estimation of Average TRU Activity in Soil Subsurface

Intervals Different From Those Sampled

20.0

Errors and Error Propagation in Computed TRU Activity

21.0

Reproducibility of IMP Measurements

22.0

Soil Density, Soil Moisture and Soil Composition

23.0

Correction Factor for the IMP 24lAm Data

B-iv

Select target paragraph3