TITLE
NO.
10.1
Computation of Total TRU Activity Removed from the
Hustead Area of Island Sally
Effeetive Area Factor for Detector SN 483
12.0
IMP Measurement Characteristics
13.0
Surface Sampling of Concrete Bunkers
14.0
Estimated TRU Content and Recommended Disposition
of Yvonne High-Grade Soil/Debris Stored in Hardtack Station 1610 Bunker
15.0
16.0
Activity Levels in Soil Stockpile on Yvonne Near
Southern Lip of Cactus Crater
Field Inspection of Grid Stakes and Portable
Instrument (PG-2) Survey of Fig/Quince Area on
Yvonne
17.0
Aomon Crypt IMP Measurement
18.0
Soil Sampling to Define the Boundaries of Subsurface
Activity
19.0
Estimation of Average TRU Activity in Soil Subsurface
Intervals Different From Those Sampled
20.0
Errors and Error Propagation in Computed TRU Activity
21.0
Reproducibility of IMP Measurements
22.0
Soil Density, Soil Moisture and Soil Composition
23.0
Correction Factor for the IMP 24lAm Data
B-iv