As

described

above,

profile

sampling

was

conducted

on

Irene

at

various

times

between

mid-November and early March. Several reasons account for the long period required to complete
this phase of sampling, chief among them being that sampling was conducted concurrently on other
islands as well. Table 6-6 presents a chronology of soil sampling missions during the
November-March period.

Surface samples were collected as a high priority task in order to

complete the characterization of the northern islands, but samples were not collected from an island
until a grid had been laid out and access lanes cleared. Plans were prepared and available for soil
profile sampling on ground zero islands and were implemented whenever they could be fit in between
surface sampling requirements.

Figures 6-17, 6-18, 6-19 and 6-20 show the locations sampled in the

early subsurface investigations conducted on test islands.

TABLE 6-6. CHRONOLOGY OF SOIL SAMPLING MBSIONS,
NOVEMBER 1977 - MARCH 1978

14,15
17

Irene
Yvonne

25,26,29
30

Irene
Pearl

17,18,*,21,22

Sally
Pearl
Irene

1978 JAN 2,3
4,5,6
23,25,26
27,28,30

Pearl
Janet
Sally
Sally

MAR 1,3
8,9
9
14
16

22
30

Vera

Irene

DEC 1,2
2
7,8
12
16
20,21,23

FEB 8
11,13
14,16
16
17
18
21
22
23

Surface

Sally
Pearl

Irene
Sally
‘Janet

Sally
Irene
Sally

Pearl
Sally
Olive

roa

1977 NOV 8,9

TYPE OF SAMPLING
GZ Profile

Lucey
Kate
Nancy
Alice
Belle, Clara, Daisy
Yvonne

Tilda
Wilma

Sally (West end)
Mary, Ruby

*Conduct of soil sampling on an island was generally planned for consecutive days; however,

mechanical problems with boats or backhoes, bad tide conditions and other unforeseen problems
interrupted planned missions on the following datess November 19; December 12; January 24;
February 6, 10, 14, and 20; March 2,7,13, and 27.

185

wee

Date

Select target paragraph3