APPENDIX A
vative to June 30, 1954 - Installation Costs (Cont.)

STS

CAPITAL COSTS
Consumed in
Operation

(E)

02
98
19
15
97
x7

18

Oper. Cost
(Bd (COED CED

(Fr)

$21,682
16.008
16,008
29,710
29,715
13,022

$

54,004
16,166
iG,675
31.790
30,380
21,870

126,145 70.865

68

BUILDING
Pavroll

(G)

$4,098
3,195
3,195
6,247
6,249
2,760

3

Other Costs

4,751
3,229
3,229
4,622
4.622
1,357

3 12.833
9,584
9,584
1s,841
18.844
S905

— Credits

S$

21,682
16,008
16,008
29,710
29,715
_ 13,022

126,145

a

934
222
1,488
ae
190
2884

223,594

178
704,451
M60 0¢©¢©6©60—

707,802
8,BS

106,089

«a3, 186.610

209,504 "0

156,504 =

156,504

|

|

Votal

Grand Total
(FeO
(Gh)

(3)

$54,004
16,166
16.675
31,790
30,360
— 2E870-

170,865 |

1,866

ee

3,051
1,133,559

—i,LiS,77S

|

2 T442,8108ST

1,113,779

OG

Material

1,866

25
33
24
Do
OL
:

184
22

|

Tr tal

TOTAL

So

733,681)

1,113,779

733,681 «1,113,779

934
222
1.488
190 |
2,834 —

3,051
«2,138,559

— _1,136,610_

166,572
431,790
704,451
707,802
8 8,815 |

04 704,451 TUNGIT 106,089 166,572 ASTID TOAAST ATGTT
180
180

60

26

122,173

_

1,849
123,635

1,849
15,23935 A95TNASO 22,1738 128,635

222,173 125,484 15,239 B9571489122173812S4B
$

$

Page A-7

40s

8

3s

$

$

$

40

Select target paragraph3