CHArTER i}, SECTION 5

Figure 2-158.

Station 2221.02 - Completed
wore

ENGINEERING. The design criteria were r2ceived on 23 April 1953. Mi. or desired char 72s
were received on 15 October. Design work started on 4 May. Three plans v.ere prepared and
submitted from 3 July to 7 October. Ap ‘rovals
were dated from 7 September to 15 October.
Station 2221.01 was not required.
CONSTRUCTION.
Work was scheduled tu
commence on | Senterrber and to he co:nnleted
by 31 December. Actual work started on 21
Octoker and was completed on 5 December.
Figure 2-158 shows the Staticn as completed.

S*ATIONS 2222.01 AND 2223.02
COAX CONNECTION PIT
SITES TARE AND RUBY - USER: UCRL
GENERAL. The wor. involved consisted of
building a pit, 5°-2” sauare by 6’-0” deep,

ENGINEERING. Thedesign criteria were received on 6 May 1953. A drawing was started

on 12 May, submitted on 21 May, approvea

and issued on 24 June.

CONSTFUCTION.
Work was scheduled to
commence on 1 September and t» he com,.leted

on 15 January 1954. Both Statious were started

Fra
.

cs

-

~~

-

ee

-

i

5 te

ot

Figure 2-159.

_

.

om

*

aaa :

Seer

aye’ an

eee

are
ey

slept
vem,
ws
Tate!

:

Q pret wee,

Station 2230 - 57% Completed

4 Lily
T

Page 2-143

* fice mani + tetgOS MI es ee en

framed with wood and with a wooden plank

cover.