Station 2221.02 - Completed
wore
ENGINEERING. The design criteria were r2ceived on 23 April 1953. Mi. or desired char 72s
were received on 15 October. Design work started on 4 May. Three plans v.ere prepared and
submitted from 3 July to 7 October. Ap ‘rovals
were dated from 7 September to 15 October.
Station 2221.01 was not required.
CONSTRUCTION.
Work was scheduled tu
commence on | Senterrber and to he co:nnleted
by 31 December. Actual work started on 21
Octoker and was completed on 5 December.
Figure 2-158 shows the Staticn as completed.
S*ATIONS 2222.01 AND 2223.02
COAX CONNECTION PIT
SITES TARE AND RUBY - USER: UCRL
GENERAL. The wor. involved consisted of
building a pit, 5°-2” sauare by 6’-0” deep,
ENGINEERING. Thedesign criteria were received on 6 May 1953. A drawing was started
on 12 May, submitted on 21 May, approvea
and issued on 24 June.
CONSTFUCTION.
Work was scheduled to
commence on 1 September and t» he com,.leted
on 15 January 1954. Both Statious were started
Fra
.
cs
-
~~
-
ee
-
i
5 te
ot
Figure 2-159.
_
.
om
*
aaa :
Seer
aye’ an
eee
are
ey
slept
vem,
ws
Tate!
:
Q pret wee,
Station 2230 - 57% Completed
4 Lily
T
Page 2-143
* fice mani + tetgOS MI es ee en
framed with wood and with a wooden plank
cover.