nominal,

In this respect, it is felt that the JIF SEVED flzgship

probebly could assist in meting any housing requirements of TC 7.2

and TG 7.5.
Vv

CONCLUSIONS:
1. Mejos Support Items
a.

In recapituletion of the major itens of support requiree fer TACHGT
Curing the overational period and exclusive of certain IGN requires
ments such as APL's, it appears that the following constituies ea
reatonable listing:

(2) 1 ~ AGC + OTF SEVEN, TG 7.3 and TC 7.)
(2)

% = APA, AXA, hospital ship or AV ~ TG 7.1

(3) 2 = LSD's ~ barge moveumts, boat pool.

(4) 1 ATF - 16 7.3
(5) 1 < APD =
(6)

intereatoll.

3 LCUts = boat pool

(7) 6 = DURW's = beat pool
(8)

3 = lelicopters - TG 7.1

(9) 3 = SA-36
be

Under Situation I unere TAONGI vould te included as a third site

(12 BIXINI operational prosedures ere not changed from REDWING), the
bulk of the abovo support would be additional to that aiiaceted to
BIKTHI and ENIWETOK.

The BIKINT end INTVETOK requirenents should be

aporoximately the same es REDITNG,

If SIXINI operations] procedures

are changed, the result would be more nearly like ec amd ¢ below.

Urstor Situation II and III, where there is no requirenest. for mecting

the contingency of epsrating afloat at BIKINI, the above would not ba