Prior to the doparturo of Task Group 7.4 fron Kirtland (FB, certain
couponents of inC-2 and inC-1 comsmnications scts were procured frou the
Navy end shipped to Kirtlom: iFB for test work.

Theso components arrived

efter the “cparturo of Task Group 7.4 from Kirtland AFB anc were requested
for shipment to AF 2272 SO onl tarch, ©
The Lorristics Linison Officer at SMA was requested to check the
availability of a compressor and tank to be used cs a starting unit for
a 100 kw dicscl ~cncrator which was back-up powor for the 100.9

The Staff Supply Officer and Staff Transportaticn Cfficer save J~4
of JTF SEVEN a verbal presentation of the Task Group 7.4 concept of rcllup fer the weather islonds. °

During the crerctions on 1 March, the 3-36 effects circraft suffered
considerable damage fro blast cffcct to tho bewb bay decors, radozc,

inspection jcors and whceel-woll -ccrs,

These itci.s were ordcred throuch

the Base Supply Officor and the Loristics Liaison Officcr, Guth, for
oarliest possible delivery.
of JTF SEVEN,

Specicl airlift wes roquested through J-4

The dcadline for the reccipt cf these itons was cstablishod

<8 on or abcut 14 Herch,+
that tine.

This was based upon the schedule cf events at
,

68._TiK fr TG 7.4 to 1G 7.4 (war), cite TGMS3-2, DTG 0103302, (UNC.).
69. TUX fr TG 7.4 to Sill, cite TIS 3-21, DTG o30210z, (ict),
70. iat fr
Subj: Staff Visit Ropors,
gen,
Awl

71.

a?

2

and Wea Rept Elm, Trov., Operctions Moan 1-54, dv) Ll har, (CCN)

ne fr JTF 7 to ShAlu. & JTF 7 LNO, Trevis AFB, DTG 050335, Ccntro

No. 3-29740, (CCNF).