PRIVAGY ACT MA ATERWAL REMOVED SUIPLY © Prior to the doparturo of Task Group 7.4 fron Kirtland (FB, certain couponents of inC-2 and inC-1 comsmnications scts were procured frou the Navy end shipped to Kirtlom: iFB for test work. Theso components arrived efter the “cparturo of Task Group 7.4 from Kirtland AFB anc were requested for shipment to AF 2272 SO onl tarch, © The Lorristics Linison Officer at SMA was requested to check the availability of a compressor and tank to be used cs a starting unit for a 100 kw dicscl ~cncrator which was back-up powor for the 100.9 The Staff Supply Officer and Staff Transportaticn Cfficer save J~4 of JTF SEVEN a verbal presentation of the Task Group 7.4 concept of rcllup fer the weather islonds. ° During the crerctions on 1 March, the 3-36 effects circraft suffered considerable damage fro blast cffcct to tho bewb bay decors, radozc, inspection jcors and whceel-woll -ccrs, These itci.s were ordcred throuch the Base Supply Officor and the Loristics Liaison Officcr, Guth, for oarliest possible delivery. of JTF SEVEN, Specicl airlift wes roquested through J-4 The dcadline for the reccipt cf these itons was cstablishod <8 on or abcut 14 Herch,+ that tine. This was based upon the schedule cf events at , 68._TiK fr TG 7.4 to 1G 7.4 (war), cite TGMS3-2, DTG 0103302, (UNC.). 69. TUX fr TG 7.4 to Sill, cite TIS 3-21, DTG o30210z, (ict), 70. iat fr Subj: Staff Visit Ropors, gen, Awl 71. a? 2 and Wea Rept Elm, Trov., Operctions Moan 1-54, dv) Ll har, (CCN) ne fr JTF 7 to ShAlu. & JTF 7 LNO, Trevis AFB, DTG 050335, Ccntro No. 3-29740, (CCNF).