[as
Headquarters 4930th Test Support Group, dated 2 April 1954.

Ut John T,

Patterson was appointed as disinterested officer to inventory the

Technical Supply Account,

This inventory has not been completed,

Despite the change, the Production Control Section functioned well
during the month,

A total of 276 aircraft work orders and 269 non—aircraft

work orders were issued.

The work order control system is working well.

The Technical Supply Unit processed 375 issue slips of which 100 were
emergency issues for aircraft parts,
also processed during the month.

A total of 210 turn-in slips

were

Supply support was excellent.

Activity in the Maintenance Shops was routine during the month,
In addition to working on the aircraft and various beautification
projects, improvement of shop facilities was effected,

This improve-

-

ment included manufacture and installation of a paint booth in the paink,

“

shop, installation of a new sheet metal storage rack and the fabrication
of a sand blasting machine to facilitate corrosion control on items of
equipment which require painting,

A continuing effort is being made

to process as much equipment as possible in order to facilitate roll up

plans,

The Engine Build-Up Section, Aero Repair Section and Auxiliary

Equipment Section carried out routine duties.
The Electronics Section had no difficulty in accomplishing routine
line maintenance and inspection,

The four (4) radio and radar repairmen

that were reassigned to the 4931lst Test Support Squadron in Janusry as
part ofArmy Augmentation were reassigned to this squadron between the

2-3

Ay
S)
J

A>

aque
~

Select target paragraph3