JOHNSTON ATOLL

F&S NO.
81006

TITLE
Missile Transfer Building

USER

STRUCTURE FACILITY NO.

ADC

PROGRAM 437

SCIENTIFIC STATION NO.

119

BOD

None
FOD

FUNDING
AGENCY
SSD
(04-695)

64-10

($000)

ENGR

PROC

CONST

TOTAL

PRE-GO
Prior Cost

3.0

54.8

57.8

TOTAL

3.0

54.8

57.8

FURN

COMPLETED

DESCRIPTION A 40 x 100-ft. steel frame structure is located between Buildings
100 and 120. The building was erected on 5-ft. high concrete piers and is bolstered internally to accommodate three (3) HP hoists witha hook height of 18-ft.

(Completed in 1964.)
DRAWINGS:

VOLI
April 1969

91-119-S1i and 52

91-119-E]

81-6